Before:

Existing conditions looking northeasterly at proposed Murrayhill PGE Substation, Beaverton, Oregon.

After:

Photo simulation illustrating proposed PGE bulk power substation and landscaping buffer.

Client: PGE

Questions? Send mail to info@studiointhegrove
Copyright 1999 Studio in the Grove
Last modified: March 29, 2000